For over 20 years Templant have been an approved supplier to one of the world leaders in power generation and temperature control rental. With over 148 plant depots across 100 countries they rely on our support for the provision of Electrical Cables, Distribution Panels, Heaters, Fencing and Onsite Electricians.
During the Festival & Event Season, when we embark on a notoriously demanding schedule, they approached us for the supply of a large volume of single core cables for delivery to Brighton and delivery and installation to Milton Keynes. Due to the nature of our relationship with them we didn’t want to let them down even if it meant working round the clock.
Each job consisted of 100metre lengths and 25metre lengths of 240mm cable which equated to us simultaneously suppling over 2000 metres of 240mm Powerlock cable and over 7000 metres of 240mm lugged cable.
Using Templant’s own specialist lifting vehicle and logistics, drivers and electrical engineers we were able to deliver the cable and install it where required to the customers satisfaction to both job sites for the specified deadline.
We believe that this demonstrates how Templant strive to fulfil their existing client’s demands for their continued and valued relationships always with the aim for complete customer satisfaction as well as servicing their current project commitments to the same high standards of workmanship and expertise.
[button text=”Download News Article” size=”small” target=”_self _blank” icon=”icon name” back_color=”” color=”” href=”https://templant.co.uk/wp-content/uploads/2014/06/Templant-News-Single-Core-Cable-Contract-2012.pdf” /]